On a ScheduleUse the On a Schedule tool is used when setting up Tracks to schedule the implementation of Tactics, for recurring campaigns such as newsletters or birthday campaigns. Procedure
Using End recurrence after: allows you to apply an end interval to the campaign to stop it running after so many occurrences. If a campaign is paused and then resumed after the one hour window of opportunity if the campaign was scheduled to run at this time it will not then run, and this occurrence will not then run again. For example:
In the campaign Track in the schedule header it correctly show (2) - BUT the fact that it does not run again means it has taken into consideration the missed job and included it as one of the three occurrences. This is because setting a campaign to stop after a certain number of occurrences is equivalent to having an End Date as you might not want that campaign to run after the specified number of occurrences. If one has failed the campaign should not run outside of the time intended. For example a retailer offering an In Store offer the for next 3 Saturdays. Even if one Saturday failed, the offer should not go out on the fourth Saturday as that offer has now ended. |
Online & Instructor-Led Courses | Training Videos | Webinar Recordings | ![]() |
|
![]() |
© Alterian. All Rights Reserved. | Privacy Policy | Legal Notice | ![]() ![]() ![]() |